Bangkadi Industrial Park 1 & 2 CCCP Project
Location: Pathumthani, Thailand
Customer: IHI Corporation
End User: Amata B.Grimm Power
Year: 2013
Gas Turbine
Supplier: GE
Type: LM6000PD
Main Fuel: Natural Gas
HRSG
No. of Units: 4
Cycle Description: 2x2X1
Design: Single Wide V-One
Pressure Levels: 2 (HP, LP)
Auxiliary Components Provided by Vogt Power
External Deaerator and External Heat Exchanger
Attemperators:
» Interstage with 453°C Set Points
Economizer Bypass System
Stack Damper and Stack Silencer
Unfired | Imperial | Metric |
HP Steam Flow | 49.4 tons/hr | 44.8 mtons/hr |
HP Steam Pressure | 638.2 psi | 44.0 bara |
HP Steam Temperature | 797°F | 425°C |
LP Steam Flow | 16.9 tons/hr | 15.3 mtons/hr |
LP Steam Pressure | 62.4 psi | 4.3 bara |
LP Steam Temperature | 354.2°F | 179°C |